To facilitate Phase 3 of the renovation and internal functional transformation project at Terminal T2 – Noi Bai International Airport, the airport will implement adjustments to the passenger flow for international travelers passing through Terminal T2 from April 24 to July 15, 2025.
1. Temporary suspension of 07 traditional immigration counters at the East Wing, 3rd floor.
2. Temporary closure of VIP Lounge B at the East Wing, 3rd floor.
3. Adjustment of security checkpoint area on the 3rd floor:
* For passengers after check-in:
- Suspension of the security checkpoint at the East Wing entrance (KS36) and security screening SC28 – 3rd floor.
- Temporary operation of the new security checkpoint KS36A and security screening KS28A – 3rd floor.

* For internal staff:
- Suspension of internal staff checkpoint KS39 for access to the restricted East Wing, 3rd floor – Terminal T2.
(Click here for details)
Noi Bai International Airport respectfully requests international passengers to take note of the above adjustments, follow the instructions of airport staff, and allocate sufficient time for travel to ensure a smooth and safe departure.